ModelRailroadForums.Com Photo Gallery

RailroadForums.com - Railroad discussion forum and photo gallery

RailroadForums.com
RR Forum - Photo Gallery
Railroad Links

ModelRailroadForums.com - Model railroad discussion forum and photo gallery

ModelRailroadForums.com
Forum - Photo Gallery
Model Railroad Links

SteamPreservation.com - Steam and railway preservation discussion forum and photo gallery

SteamPreservation.Com
Forum - Photo Gallery
Tourist RR Links - Spotters Guide

Model RR Supplier Directory
Model Railroad Links

Model RR Product Reviews

RailroadBookstore.com - Railroad Books
Model Railroad Books  - Thomas & Friends


Share this on your favorite Social Network:
ModelRailroadPhotos.com Model Railroad Photo Gallery
Featuring Model Railroad Photos from around the world
Everyone is welcome to view images in the gallery.
ModelRailroadForums.com members may upload photos.
Use the links below to register or log in to the gallery.
  Home · Search · Register · Login 

Home » Technical and Design » Track Planning and Design « Previous image  · Slide Show · Next image »
« more
zeis69Plan.JPG
Selma1.jpg
Prattville_Sub.jpg
Maplesville_Sub.jpg
Jones6.jpg
Browns.jpg
Layout_for_Dude2.PNG
Finished_Up_Layout.JPG
Cascade_Route.jpg
1garag20.jpg
1garage2.jpg
1640cascade.jpg
1Layout1.jpg
88argoterminal.jpg

« Previous image · Next image »

1garage2
Garage Plan 2

« Previous image  · Slide Show · Next image »

Photo Details
modelbob


Administrator

Registered: August 2004
Posts: 1,468
users gallery
OK, here's a revised version to try and fix a couple of problems noted in various comments.


The track has been changed to be less symmetrical and not always at right angles. The curve from the staging yard to the station has been increased to 20 inch radius for better operations. The custom curved diamonds have been replaced with stock 60 degree diamonds. An access hatch allows better access to the switches at the west (left) end of the staging yard.


I've also totally embraced the passenger / station theme in this version. Passenger trains are now the main focus of this layout.


The staging yard now serves as the coach yard. The switch crew makes up passenger trains by picking up coaches there, and picking up a baggage and/or mail car from the express track.


The train is assembled in the station, then the power is coupled on and the passenger train departs and does a few laps. Upon return, it pulls into the station. The switch crew has to pull the train out so the engine can escape, then they return the cars to the servicing portion of the yard, mail to the express tracks, possibly a special spot for the diner to be re-stocked etc.


The green track is a branchline to allow for some freight operations too. It is actually above the other tracks, climbing up after it passes behind the station (obviously need a bit of re-aligment there, the station itself will be above the tracks, so the branch can pass under the building)


It will meander through the layout, eventually reaching a town and/or mine on the right side. This area will be above, and seperate from, the coach yard area. The tracks will be in the same scene to the duckunder, then the spur will go to a second level.
· Date: Sat January 15, 2005 · Views: 8,362 · Filesize: 103.6kb · Dimensions: 820 x 614 ·
Additional Info
Quick Rate: Poor Excellent
Keywords: Garage Plan 2
Scale: HO


Author
Thread  
Joe Daddy
C & SF, my obsession

Registered: October 2006
Location: Colorado
Posts: 421
Sun August 12, 2007 10:39pm

Bob,
How is your layout progressing?
Joe

------------------------------
Joe Daddy My model railroad blog and home of a few of the many lessons learned as a Newbie. http://wwwjoe-daddy.blogspot.com
This user is offline
Click here to see this users profile Click here to Send this user a Private Message Visit Joe Daddy's homepage! Find more posts by this user Visit this user's gallery  

Photo Sharing Gallery by PhotoPost
Copyright © 2011 All Enthusiast, Inc.

Copyright 2011 RailroadForums.com